Ashley Build is a highly skilled team of reliable builders able to undertake both residential and commercial construction and refurbishment.

We have worked with homeowners and businesses for many years. We are rapidly growing and have a diverse range of references from satisfied customers.

Read More...

Superstructure

We are qualified in the new thin joint block system to ensure a speedier process for extensions or new build, added to this is the Beco wallform insulating concrete formwork system.

More about the new thin joint block system

The Celcon Thin-Joint System combines the Celcon Plus range of high quality, accurately dimensioned aircrete blocks with Celfix, a specially developed Thin-Joint mortar.

Thin-Joint blockwork enables walls to be built very quickly without having to wait the conventional 24 hours for the mortar to set before further loading can be applied.

More information can be found here.

 

More about the Beco Wallfrom

With a proven track record over 30 years worldwide this insulated formwork system has the flexibility to suit almost any design requirement.

An insulating concrete formwork (ICF) system, Beco WALLFORM is based on large hollow lightweight block components that lock together without intermediate bedding materials to provide a formwork system into which concrete is poured.

Once set, the concrete becomes a high strength structure and the formwork remains in place as thermal insulation, with u-values ranging from 0.30 w/m²k down to 0.11 w/m²k - ideal for zero energy buildings. The building process is quick, tidy and precise, with lower labour and equipment requirements than alternative methods.

More information can be found here.